Project 509 – Greenford Road
Project Type: Chimney Breast Removal
Services Provided: Structural Engineering, Construction
Location: Ealing
Status: Complete 2025
The client approached us after receiving an unfeasible and overly complex design from another structural engineer. He needed a practical and cost-effective solution for removing four chimney breasts across two floors of his home.
We attended the property the same day to assess the structure and proposed a revised design that was both structurally sound and buildable. We provided a clear quote covering both the design and construction aspects, which the client approved without hesitation.
Structural design and calculations for safe chimney breast removal
Liaison and coordination with building control
Safe removal and disposal of chimney breasts at ground and first floor
Supply and installation of steel beams
Final building control approval
The project was delivered on time and within budget, with minimal disruption to the client. All works met the structural and compliance standards required by building control, and the client was extremely satisfied with the result.