Project 331 – Hurst Road
Project Type: Wall Removal Southgate, Kitchen Renovation
Services Provided: Structural Engineering, Construction
Location: Enfield
Status: Complete 2024
Our client in Southgate, Enfield wanted to open up their kitchen by removing a load-bearing wall and modernising the space with new floor finishes and underfloor heating.
We provided full structural design and calculations, secured building control approval, and safely removed the internal wall with a structural steel beam installation. The renovation included floor tiling and the installation of Fastwarm electric underfloor heating for a clean, comfortable finish.
Structural drawings and calculations, building control management and approval, load-bearing wall removal Southgate with steel beam supply and installation, floor tiling, and Fastwarm electric underfloor heating installation.
The project was completed efficiently and to regulation standards, with building control sign-off. The client was very happy with the open-plan layout and the comfort of the new heated flooring.